Prompt Business

Growth Experiment Designer: Ranked Testing Backlog

A prompt that converts a pile of growth ideas into falsifiable experiments with minimum viable tests, decision rules, ICE scores and a ranked backlog.

  • 🤖 Claude, ChatGPT, Gemini
  • 🗂️ Business

Last verified: write-up checked

Prompt by Mahmoud Omar · Original source (opens in a new tab)

Growth Experiment Designer: Ranked Testing Backlog — prompt preview

The prompt

prompt
You are a growth experimentation lead. Convert my idea pile into a ranked experiment backlog. Be ruthless: ideas that can't produce a decision are not experiments.

CONTEXT:
- Product + current growth model in one paragraph: [X]
- THE BOTTLENECK right now (acquisition / activation / retention / monetization + evidence): [X]
- Monthly traffic/user volume available for testing: [X]
- Resources: [who can build/run tests, budget]
- Past experiments already run (so you don't re-suggest my graveyard): [list or "none logged"]

MY IDEA PILE:
[paste raw ideas, any format]

FOR EACH IDEA, BUILD:
1. HYPOTHESIS — "We believe [specific change] will move [metric] by [estimated range]
   because [insight/evidence]." If no honest 'because' exists, mark the idea
   NOT AN EXPERIMENT and move it to a "needs research first" list.
2. MINIMUM VIABLE TEST — the smallest/cheapest version that gives a real answer
   (fake-door, concierge, geo-split, subset rollout). Shrink scope, not rigor.
3. SAMPLE & DURATION check — with MY volume, can this reach a readable result in
   ≤4 weeks? If not: flag it and either redesign for a bigger effect size or park it.
4. DECISION RULE — written NOW: "if [metric] ≥ [X] → scale; between [X-Y] → iterate
   once on [variable]; below [Y] → kill." No test ships without one.
5. ICE SCORE — Impact (on THE bottleneck, not any metric) / Confidence (evidence-based:
   customer data > competitor precedent > opinion) / Ease. Show reasoning per digit —
   unexplained scores are vibes in a spreadsheet.

THEN OUTPUT:
- THE RANKED BACKLOG (table) with the top 3 marked "this sprint"
- CONFLICTS: which experiments contaminate each other if run simultaneously
- THE MISSING EXPERIMENT: given my bottleneck, the highest-leverage test NOT in
  my idea pile — and why I'm probably avoiding it

What it is

A prompt that converts a pile of growth ideas into falsifiable experiments with minimum viable tests, decision rules, ICE scores and a ranked backlog. Each idea gets a hypothesis ("We believe... because..."), a minimum viable test, a sample and duration check against your real traffic, a decision rule written in advance and an ICE score with reasoning per digit. Ideas with no honest "because" are moved to a "needs research first" list. The prompt is copied unmodified from Mahmoud Omar's growth-marketing-os repository (MIT licence). Original author: Mahmoud Omar.

Who it's for

  • Growth leads
  • Founders
  • Product-led marketers

Requirements

Requirements

  • Your bottleneck with evidence
  • Monthly traffic or user volume
  • A list of ideas

برومبت يحوّل كومة أفكار نمو إلى تجارب قابلة للاختبار مع أصغر اختبار ممكن وقواعد قرار ودرجات ICE وقائمة مرتبة.

Examples

From the source

Prompt
prompt
You are a growth experimentation lead. Convert my idea pile into a ranked experiment backlog. Be ruthless: ideas that can't produce a decision are not experiments.

CONTEXT:
- Product + current growth model in one paragraph: [X]
- THE BOTTLENECK right now (acquisition / activation / retention / monetization + evidence): [X]
- Monthly traffic/user volume available for testing: [X]
- Resources: [who can build/run tests, budget]
- Past experiments already run (so you don't re-suggest my graveyard): [list or "none logged"]

MY IDEA PILE:
[paste raw ideas, any format]

FOR EACH IDEA, BUILD:
1. HYPOTHESIS — "We believe [specific change] will move [metric] by [estimated range]
   because [insight/evidence]." If no honest 'because' exists, mark the idea
   NOT AN EXPERIMENT and move it to a "needs research first" list.
2. MINIMUM VIABLE TEST — the smallest/cheapest version that gives a real answer
   (fake-door, concierge, geo-split, subset rollout). Shrink scope, not rigor.
3. SAMPLE & DURATION check — with MY volume, can this reach a readable result in
   ≤4 weeks? If not: flag it and either redesign for a bigger effect size or park it.
4. DECISION RULE — written NOW: "if [metric] ≥ [X] → scale; between [X-Y] → iterate
   once on [variable]; below [Y] → kill." No test ships without one.
5. ICE SCORE — Impact (on THE bottleneck, not any metric) / Confidence (evidence-based:
   customer data > competitor precedent > opinion) / Ease. Show reasoning per digit —
   unexplained scores are vibes in a spreadsheet.

THEN OUTPUT:
- THE RANKED BACKLOG (table) with the top 3 marked "this sprint"
- CONFLICTS: which experiments contaminate each other if run simultaneously
- THE MISSING EXPERIMENT: given my bottleneck, the highest-leverage test NOT in
  my idea pile — and why I'm probably avoiding it

Expected output: Prompt text as published in the source (see source link).

Tips

  • Give your real monthly volume; the prompt flags tests that cannot read out within four weeks.
  • List past experiments so it does not suggest them again.